Road changes in MCE starts today

http://www.lta.gov.sg/content/ltaweb/en/roads-and-motoring/projects/marina-coastal-expressway-mce/key-travelling-routes.html

Motorists will enjoy a more direct connection between MCE and the city centre

The Land Transport Authority (LTA) has completed the new roads in Marina South and will open them from 5am on Sunday, 28 September 2014. The opening of the new roads will provide a more direct connection between the Marina Coastal Expressway (MCE) and various parts of the city centre, including the Tanjong Pagar and Marina Bay areas.MCE road changes

Tanjong Pagar area

Motorists travelling from the Tanjong Pagar area (Anson Road, Maxwell Road and Shenton Way) can make use of a new direct connection from Maxwell Road to get onto the MCE towards KPE and ECP. The existing slip road from MCE Exit 1 will also be realigned to Maxwell Road.  A stretch of slip road between Maxwell Road and Central Boulevard will also be expunged.

Marina Bay area

For motorists travelling from MCE Exits 2 and 3 towards Shenton Way and Bayfront Avenue, they can expect a smoother connection with the straightening of Central Boulevard. As part of the road changes, Bayfront Avenue will be extended to the Marina Bay MRT station to provide better connectivity.

Bus route changes

With the changes to the road network, bus services 106, 133, 400 and 402 will be re-routed. The existing bus stop (no. 03531) along Central Boulevard (towards MCE) in front of Marina Bay Financial Centre will be removed. The four affected bus services calling at this bus stop will re-routed to bus stop (no. 03391) along Marina Boulevard.

In the opposite direction, two bus stops (no. 03539 and no. 03319), located along Central Boulevard (towards Shenton Way) and Marina Station Road respectively, will be removed.  Bus service numbers 97, 106, 133, 400, 402, 502 and 513 which currently call at these bus stops will now stop at a new bus stop located after the junction of Central Boulevard and Bayfront Avenue.

Please refer to the Annex for full details of the road network changes.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s